Last edited by Samurisar
Sunday, July 19, 2020 | History

2 edition of Analysis of cost estimates for the space shuttle and two alternate programs found in the catalog.

Analysis of cost estimates for the space shuttle and two alternate programs

Analysis of cost estimates for the space shuttle and two alternate programs

report to the Congress [on the] National Aeronautics and Space Administration

by

  • 68 Want to read
  • 36 Currently reading

Published in [Washington] .
Written in English

    Subjects:
  • United States. National Aeronautics and Space Administration.,
  • Space shuttles -- Costs.

  • Edition Notes

    Statementby the Comptroller General of the United States.
    Classifications
    LC ClassificationsTL795.5 .U55 1973
    The Physical Object
    Pagination67 p.
    Number of Pages67
    ID Numbers
    Open LibraryOL5523768M
    LC Control Number73602078

    North Bryan Avenue - Included in the application are two cost estimates for the required improvements totaling between $, and $, The property owner is requesting $50, to help fund the following Life Safety improvements as required by the International Building Code and International Fire Code. Interpretation and analysis—as they relate to image exploitation—require two distinct sets of abilities, skills, and knowledge (figure 3). A person may possess one set without the other.

    Potential Surge Pricing! {{ }} varies their pricing based on demand. The estimate here assumes a multiplier of {{ tiplier() }}x, which is the current surge multiplier at the time of this estimate, but the actual multiplier used when you take your trip may vary depending on time of day, the number of drivers on the road, and the number of users looking for rides. In selecting a particular method of transportation you must consider: (a) The total cost to the Government, including per diem, overtime, lost worktime, actual transportation cost, total distance of travel, number of points visited, the number of travelers and energy conservation. As stated in 5 U.S.C. , “travel of an employee shall be by the most expeditious means of transportation.

      How to Calculate Man Hours. Man-hours are a crucial element in submitting a winning project bid as well as charging for work completed. Because labor constitutes such a large portion of any contract work, estimating and reporting hours 69%(41). Reliability engineering is a sub-discipline of systems engineering that emphasizes dependability in the lifecycle management of a ility describes the ability of a system or component to function under stated conditions for a specified period of time. Reliability is closely related to availability, which is typically described as the ability of a component or system to function at.


Share this book
You might also like
current status of fetal heart rate monitoring and ultrasound in obstetrics

current status of fetal heart rate monitoring and ultrasound in obstetrics

Fear Is the Key

Fear Is the Key

architecture of humanism

architecture of humanism

Sports illustrated book of swimming.

Sports illustrated book of swimming.

Musical Performance

Musical Performance

Employment of session messengers in House Post-Office.

Employment of session messengers in House Post-Office.

1974 seminar papers

1974 seminar papers

Directory of foreign lawyers

Directory of foreign lawyers

Science and scientific researchers in modern society

Science and scientific researchers in modern society

Wholistic Health Centers

Wholistic Health Centers

Performance audit of the Colorado Department of Personnels annual total compensation survey

Performance audit of the Colorado Department of Personnels annual total compensation survey

Tax harmonization and financial liberalization in Europe

Tax harmonization and financial liberalization in Europe

Canons of the synod of the diocese of Ottawa

Canons of the synod of the diocese of Ottawa

The tale of Chloe

The tale of Chloe

Analysis of cost estimates for the space shuttle and two alternate programs by Download PDF EPUB FB2

Analysis of cost estimates for the space shuttle and two alternate programs. [Washington] (OCoLC) Material Type: Government publication, National government publication: Document Type: Book: All Authors / Contributors: United States.

General Accounting Office. OCLC Number: Notes: Cover title. "B". Get this from a library. Analysis of cost estimates for the space shuttle and two alternate programs report to the Congress [on the] National Aeronautics and Space Administration.

[United States. General Accounting Office.]. Analysis of Cost Estimates for the Space Shuttle and Two Alternate Programs. Washington, DC: U.S. Government Printing Office; Jun. Report No.: B Theses and dissertations. Source: Budget Bureau, “NASA Issues Paper,” August attachment, “Space Transportation System,” Aug The analysis showed that at the lowest level of activity, averaging 28 flights per year, the Shuttle would barely compete with the Titan III even on a straight dollar-for-dollar basis, without discounting.

The table, "Costs of Three Space Programs," gives an example of an equal-capability analysis, in undiscounted dollars. This type of analysis could be described as highly conservative, for it ignored the likelihood that with the Shuttle chopping the cost of space activity, government and commercial agencies would seek to do more in space.

Lance Cole - Commercial Crew Cost Estimating - A Look at Estimating Processes, Challenges and Lessons Learned To support annual PPBE budgets and NASA HQ requests for cost information for commercial crew transportation to the International Space Station (ISS), the NASA ISS ACES team developed system development and per flight cost estimates for.

The Space Shuttle program was the fourth human spaceflight program carried out by the National Aeronautics and Space Administration (NASA), which accomplished routine transportation for Earth-to-orbit crew and cargo from to Its official name, Space Transportation System (STS), was taken from a plan for a system of reusable spacecraft of which it was the only item funded for First crewed flight: STS-1, Ap • Into deep space q=σεAT4 • Between two surfaces q=σε1ε2A1 F (T1 4-T 2 4) • If one surface is Earth, assume ε=1 and T= to K Technically, q= A(T4-T4) but T deep space is 4K, two surfaces, once we File Size: KB.

Vol II, Book 1 FOREWORD This document is Book 1, Analysis and Design of Volume II, Technical Report. It is a part of Lockheed Propulsion Company's final report for the Study of Solid Rocket Motors for a Space Shuttle Booster. Project management is “the application of knowledge, skills, tools and techniques to project activities to meet project requirements.” 7.

Project Management Tools and Techniques Project management tools and techniques assist project managers. Fletcher went on to explain that this approach, while a cost saver for the future, would require "large government expenditures for development and construction of ground terminals in the FY period when space shuttle development expenditures will be at their [] peak." The alternative was leasing the services from an industry.

Chapter 5 argued that substantial improvements in the cost-effectiveness of operational testing can be achieved by test planning and state-of-the-art statistical methods for test design.

It was also noted that achieving the full benefit of improved test design requires a. national aeronautics and space administration fy president's budget request summary fy actual fy estimate fy request fy fy fy fy 18, 17, 17, 17, 17, 17, 17, on Space Shuttle operations and systems.

InErminger became a flight controller himself. With more than 10 years in Shuttle operations, Erminger was acutely aware of the critical importance of safety issues in low-Earth orbit.

In Erminger moved to the office of Space Shuttle Safety, Reliability, and Quality Assurance as its Manager. Moments later Webb presented JFK with a $20 billion estimate. The actual cost came out to be about $24 billion or a 20% overrun from that estimate. Myths – whether actually true or not – illustrate some value in a culture.

The value illustrated here is that all cost estimates come in lower than what the program will really cost. These costs compared with estimates prepared by the Aerospace Corp. for a two-stage fully-reusable shuttle: development, $ billion, with a peak of $ billion [Morgenstern and Heiss, Analysis,p.

The pressure-fed booster yielded a development cost less than half that value, with a peak comfortably under the OMB. Rail Rates. Get discounted fares on rail travel within Amtrak's Northeast Corridor. Car Sharing. Car-sharing is available to federal employees who need to use a car for less than one day as part of a pilot program in Washington DC, New York City, Boston and Chicago.

Situated on the west coast of Canada, Vancouver Island is the largest island on the west coast of the Americas, comprising an area of 31, square kilometers (2, square miles), beingFile Size: 2MB.

Even SpaceX’s BFR is still just a big F’in rocket. Even the space shuttle, which was supposed to make it easier to ferry satellites and people into Earth orbit by being the first re-usable launch vehicle, relied on very large rockets (three of them –the main widebody “External Tank” that the shuttle was attached to, which had liquid oxygen and hydrogen, and two smaller rocket.

For the First Time, Twitter Tries to Fact-Check Trump's Tweets. Twitter decided to place the disclaimers on two tweets from President Trump that claim mail-in voting will lead to a rigged election.

A molten salt reactor (MSR) is a class of nuclear fission reactor in which the primary nuclear reactor coolant and/or the fuel is a molten salt mixture. MSRs offer multiple advantages over conventional nuclear power plants, although for historical reasons they have not been deployed. The concept was first established in the s.On the tiles of the space shuttle: a risk analysis in and the Columbia accident of Paté-Cornell, M., E.

Component choice for managing risk in engineered systems with generalized risk/cost functions RELIABILITY ENGINEERING & SYSTEM SAFETY Guikema, S. D., Pate-Cornell, M. E. ; .36 / Lunar Base Concepts Program was started in 1, and dozen of studies were carried out by NASA, its contractors, the U.S.

Air Force, and other organizations. A biliography of these studies has been compiled by Lowman (1 ), but only a few main concepts can be summarized in this paper. The great majority of lunar base concepts proposed in the s were predicated.